No positions in the markets we measure BY 07:30 ET
CCIR Compute Credit
Index Research
Credit · Tracked as filed as of 2026-08-18

Applied Digital

CCIR tracks 17 instruments issued by Applied Digital (APLD): other, credit facility, bond, convertible. Every row traces to a primary document.

Fixed coupons at issue
Filed coupon, by issue date · hollow = convertible · window Jul 2022 – Jun 2026
2.5% 5% 7.5% 10% 2023202420252026 Starion Term Loan Starion Ellendale L… Cornerstone Bank Lo… conv '30 Macquarie Promissor… MEC Promissory Note notes '30 DevCo notes '31 notes '31
Floating spreads at signing
Filed spread over SOFR, by signing date · window Feb 2025 – May 2026
+1 +2 +3 +4 Jul '252026 SMBC Credit and Gua… 2025 Revolving Cred… Goldman Sachs Bridge Revolving Credit

Capital stack by borrower

Which entity owes what, as filed. Facilities raised in a subsidiary sit on that subsidiary's assets; the parent's own paper sits beside them, senior to nothing below it.

BorrowerInstrumentSize $mRate
Applied Digital (parent level) Other long-term debt: 2 SAFEs + 2 promissory notes 18.5 Undisclosed
2.75% Convertible Senior Notes due 2030 450 2.75%
Applied Digital Corporation Texas Capital Bank term loan 58.5 Undisclosed
2025 Revolving Credit Facility 65 S+2.75%
APLD ComputeCo 3 LLC 7.000% Senior Secured Notes due 2031 1,590 7%
Goldman Sachs Bridge Facility ($300M, ELN-04 construction) 300 S+2.75%
APLD Intermediate HoldCo Revolving Credit Facility 430 S+2.25%
APLD ComputeCo 2 LLC 6.750% Senior Secured Notes due 2031 2,150 6.75%
APLD DevCo LLC DevCo Facility (MEC promissory note, new-project development) 85 8%
APLD ComputeCo LLC 9.25% Senior Secured Notes due 2030 2,350 9.25%
APLD FAR-01 LLC MEC Promissory Note (Polaris Forge 2 / Harwood, FAR-01, $50M) 50 8%
APLD HPC Holdings LLC SMBC Credit and Guaranty Agreement ($375M term loans, Polaris Forge 1) 375 S+3.50%
APLD ELN-02 Holdings LLC Macquarie Promissory Note (Ellendale / Polaris Forge 1, $150M) 150 0.25%
APLD Holdings 2 LLC CIM Promissory Note (Ellendale HPC / ELN-02) 125 Undisclosed
APLD GPU-01, LLC Cornerstone Bank Loan (GPU-01) 9.9 8.59%
APLD ELN-01 LLC Starion Ellendale Loan (ELN-01) 8.1 7.48%
APLD Hosting, LLC Starion Term Loan (Hosting) 3.9 6.5%

Instruments

Other long-term debt: 2 SAFEs + 2 promissory notes

Other $18.5m Undisclosed FY2025–FY2026
Seniority
Undisclosed
Maturity
Undisclosed
Collateral
SAFEs at Cloud subsidiary
Lenders
Unnamed
Pricing
SAFEs non-interest-bearing; note rates undisclosed
Terms
Two promissory notes (~$18.5M total, entered Q2 FY2026), within the $34.762M 'Other debt' line at 5/31/26. The $12.0M of SAFE proceeds formerly in this line was paid off 6/2/26 for $13.3M (FY26 10-K subsequent events).

Source: FY26 10-K debt note + subsequent events (acc 0001144879-26-000048) · document

Texas Capital Bank term loan

Credit facility $58.5m Undisclosed Entered 2026-06-30
Borrower
Applied Digital Corporation (borrower)
Seniority
Secured (Loan and Security Agreement)
Maturity
2031-06-30
Collateral
Not itemized in the FY26 10-K
Lenders
Texas Capital Bank
Pricing
Adjusted term SOFR + applicable margin; margin not disclosed
Terms
Promissory note, stated principal $58.5M; Loan and Security Agreement 6/30/26 (collateral not itemized in the 10-K)

Source: FY26 10-K subsequent events (acc 0001144879-26-000048) · document

7.000% Senior Secured Notes due 2031

Bond $1,590m 7% Entered 2026-06-16
Borrower
APLD ComputeCo 3 LLC (issuer)
Seniority
Senior secured, project-level; parent completion guarantee
Maturity
2031-06-15
Collateral
1st liens on ComputeCo 3 + ELN-04 entities (150 MW, Polaris Forge 1)
Lenders
144A; Goldman Sachs (representative) · Wilmington Trust (trustee)
Pricing
Amortizes semi-annually Jun 15/Dec 15 per the Indenture (FY26 10-K)
Terms
Issued at 100.0 Proceeds refinanced the $300M Bridge Facility at closing 6/16/26 (FY26 10-K).

Source: 8-K 6/16/26; pricing 8-K 6/9/26 · document

Revolving Credit Facility

Credit facility $430m S+2.25% Entered 2026-05-29
Borrower
APLD Intermediate HoldCo (borrower)
Seniority
Secured revolver; Holdings (Applied Digital Corporation) and restricted-subsidiary guarantees
Maturity
2029-05-28 — The earlier of the third anniversary of closing and 91 days before the redemption date under the April 2025 Preferred Equity Purchase Agreement (as amended through the Fifth Amendment of 2026-05-29).
Collateral
Certain non-data-center project assets
Lenders
First National Bank of Omaha (admin/collateral) · GS Lending Partners (lead-left) · Mizuho · RBC · Santander · Wells Fargo
Pricing
Term SOFR + 2.25% per the 8-K description; the filed agreement redacts the margin and unused fee; 0.00% floor; default rate +2%
Terms
$430M commitments: $350M at the 2026-05-29 closing plus an $80M Incremental Assumption No. 1 (2026-06-26, identical terms other than fees), with $120M of remaining incremental capacity (per the 6/26/26 8-K and FY26 10-K) to a $550M ceiling; draws undisclosed. Letter-of-credit sublimit equals the full facility. The filed agreement redacts the margin, the unused fee and the entire financial covenant; the covenant is monthly-tested with a cure right, and the S+2.25% on this row rests on the 8-K description alone. Collateral excludes the Texas Capital Bank loan collateral and real property at or under $15M fair market value.

Source: 8-K 6/26/26, credit agreement filed as EX-10.1 (redacted) and Incremental Assumption No. 1 as EX-10.2, acc 0001493152-26-030333; PR 8-K 6/9/26 · document

Goldman Sachs Bridge Facility ($300M, ELN-04 construction)

Credit facility $300m S+2.75% Entered 2026-05-01 Resolved 2026-06-16
Borrower
APLD ComputeCo 3 LLC (borrower)
Seniority
Senior secured; full-recourse parent guarantee
Maturity
2027-04-30
Collateral
Collateral Agency, Security and Depositary Agreement; pledge of the equity interests in APLD ComputeCo 3
Lenders
Goldman Sachs Bank USA
Pricing
Daily Simple SOFR + 2.75% or Base Rate + 1.75%
Terms
$300.0M fully drawn ($300,000K on the 5/31/26 balance sheet); proceeds funded ELN-04 construction, improvement and equipment. REFINANCED 2026-06-16 by the $1.59B 7.000% senior secured notes due 2031 (issued at par; FY26 10-K + 8-K 6/16/26).

Source: 8-K 5/5/26 (origination); FY26 10-K + 8-K 6/16/26 (refinance) · document

6.750% Senior Secured Notes due 2031

Bond $2,150m 6.75% Entered 2026-03-10
Borrower
APLD ComputeCo 2 LLC (issuer)
Seniority
Senior secured, project-level; parent completion guarantee
Maturity
2031-03-15
Collateral
Polaris Forge 2 (Harwood ND, 200 MW leased to Oracle); escrow release condition satisfied 6/18/26
Lenders
144A; Goldman Sachs (representative) · Wilmington Trust (trustee)
Pricing
amortizes semi-annually Mar 15/Sep 15; interest semi-annual from Sep 15, 2026 (FY26 10-K)
Terms
Issued at 98.0

Source: 8-K 3/10/26; 8-K/A 6/17/26 (escrow release) · document

DevCo Facility (MEC promissory note, new-project development)

Credit facility $85m 8% Entered 2025-12-18 Resolved 2026-05-29
Borrower
APLD DevCo LLC (borrower)
Seniority
Senior secured, subsidiary level; parent guarantee
Maturity
2027-12-18 — Earliest of acceleration, 7/18/26 (if Initial Lease Execution missed 4/18/26), or 12/18/27
Collateral
Guarantee and collateral agreement by APLD Intermediate and DevCo subsidiaries in favor of MEC
Lenders
Macquarie Equipment Capital, Inc.
Pricing
8.0% + return hurdles; post-default 8.0% + 1.50%/month
Terms
$45M First Draw (12/18/25) + $40M Second Draw (2/24/26) = $85M drawn; $15M Third Draw provided for, no draw disclosed; amended and restated 2/24/26. REPAID IN FULL 2026-05-29 incl. accrued interest and rate of return ($9.4M capitalized to CIP; FY26 10-K). Same-day as the FNBO 2026 revolver signing; no filing links the two.

Source: 8-K 12/22/25 (origination); FY26 10-K (repayment) · document

9.25% Senior Secured Notes due 2030

Bond $2,350m 9.25% Entered 2025-11-20
Borrower
APLD ComputeCo LLC (issuer)
Seniority
Senior secured, project-level; parent completion guarantee
Maturity
2030-12-15
Collateral
ELN-02/03 — Polaris Forge 1, Ellendale ND, CoreWeave-leased campus; Wilmington Trust collateral agent
Lenders
144A; Morgan Stanley (representative)
Pricing
Amortizes from Dec 15, 2027
Terms
Issued at 97.0

Source: Fiscal Q3 FY26 10-Q (ended 2/28/26, filed 4/8/26) · document

2025 Revolving Credit Facility

Credit facility $65m S+2.75% Entered 2025-11-10
Borrower
Applied Digital Corporation (borrower)
Seniority
Secured revolver
Collateral
All of the Company's assets (none of its subsidiaries')
Lenders
First National Bank of Omaha
Pricing
SOFR + 2.75% per annum on the outstanding balance; unused facility fee 0.35%/yr on daily average unused amount, quarterly in arrears (FY26 10-K)
Terms
$65M aggregate principal of revolving loans and letters of credit; amounts borrowed and repaid are available for future borrowing; draws undisclosed. Modified 5/29/26 and the standby letters of credit transferred on entry into the 2026 Revolving Credit Facility.

Source: 10-K FY2026 (acc. 0001144879-26-000048), Debt note · document

MEC Promissory Note (Polaris Forge 2 / Harwood, FAR-01, $50M)

Credit facility $50m 8% Entered 2025-09-09 Resolved 2025-11-28
Borrower
APLD FAR-01 LLC (borrower)
Seniority
Senior secured, subsidiary level; parent guarantee
Maturity
2027-09-09
Collateral
Guarantee and collateral agreement: APLD FAR-01, APLD FAR Holdings and APLD FAR-02 as grantors in favor of MEC
Lenders
Macquarie Equipment Capital, Inc.
Pricing
8.0%; PIK (capitalized) first 12 months
Terms
$50M Initial Loan drawn at the 9/9/25 closing; up to $25M Additional Loans by mutual consent (no draw disclosed). Mandatory prepayment within 90 days of the 200 MW Lease Execution (occurred 10/20/25). REPAID IN FULL 2025-11-28 incl. accrued interest and rate of return (FY26 10-K).

Source: 8-K 9/12/25 (origination); FY26 10-K (repayment) · document

SMBC Credit and Guaranty Agreement ($375M term loans, Polaris Forge 1)

Credit facility $375m S+3.50% Entered 2025-02-11 Resolved 2025-11-20
Borrower
APLD HPC Holdings LLC (borrower) with subsidiary guarantors
Seniority
Senior secured, subsidiary level
Maturity
2026-08-11 — 18 months from the 2/11/25 closing
Collateral
Not itemized in cited filings
Lenders
Sumitomo Mitsui Banking Corporation (administrative agent) · lenders party thereto
Pricing
Daily simple SOFR + 3.50% (months 0-6) / +4.50% (6-12) / +5.50% thereafter; base-rate + 2.50/3.50/4.50% same steps
Terms
$375M of term loans; proceeds prepaid the Macquarie note, funded Polaris Forge 1 development and the Interest Reserve Account; FY25 average rate 7.82%. REPAID IN FULL 2025-11-20 concurrent with the $2.35B 9.250% notes closing (FY26 10-K).

Source: FY25 10-K (origination); FY26 10-K (repayment) · document

Macquarie Promissory Note (Ellendale / Polaris Forge 1, $150M)

Credit facility $150m 0.25% Entered 2024-11-27 Resolved 2025-02-11
Borrower
APLD ELN-02 Holdings LLC (borrower; later APLD HPC Holdings LLC)
Seniority
Senior secured, subsidiary level; limited guarantee by APLD Holdings 2 LLC
Maturity
2026-05-27 — 18-month term; mandatory repayment if ELN-02 Project incomplete by 12/6/25
Collateral
Guarantee and collateral agreement in favor of Macquarie Equipment Capital (8-K exhibits 12/2/24)
Lenders
Macquarie Equipment Capital, Inc.
Pricing
0.25% stated coupon + minimum-return hurdle 1.11x (first four months) scaling to 1.35x over term
Terms
$150M loan; warrants for 1,035,197 shares at $9.66 as partial consideration; proceeds repaid the CIM note and the Yorkville March note. REPAID IN FULL 2025-02-11 with SMBC term loan proceeds, incl. multiple-on-invested-capital; $11.8M extinguishment loss (FY25 10-K).

Source: 8-K 12/2/24 (origination); FY25 10-K (repayment) · document

2.75% Convertible Senior Notes due 2030

Convertible $450m 2.75% Entered 2024-11-04
Seniority
Senior unsecured (parent)
Maturity
2030-06-01
Lenders
144A; Wilmington Trust (trustee)
Pricing
Conversion ~$9.75; capped calls + prepaid forward

Source: FY25 10-K 7/30/25; 10-Q · document

CIM Promissory Note (Ellendale HPC / ELN-02)

Credit facility $125m Undisclosed Entered 2024-06-07 Resolved 2024-11-27
Borrower
APLD Holdings 2 LLC (borrower)
Seniority
Senior secured (subsidiary borrower) with parent guaranty
Collateral
Grantors (APLD Hosting, ELN-01, ELN-02, Holdings 1/2, ELN-02 Holdings) pledged substantially all assets ex-Excluded Assets + mortgages on certain properties
Lenders
CIM APLD Lender Holdings, LLC
Pricing
Rate and maturity not disclosed (in unfiled note exhibit)
Terms
Up to $125M; $15M drawn 6/7/24, fully drawn during FY25; warrants for 9,265,366 shares at $4.8005 as partial consideration (cashless-exercised FY25). REPAID IN FULL 2024-11-27 with Macquarie ELN-02 note proceeds; $9.4M extinguishment costs capitalized to CIP (FY25 10-K).

Source: 8-K 6/7/24 (origination); FY25 10-K (repayment) · document

Cornerstone Bank Loan (GPU-01)

Credit facility $9.9m 8.59% Entered 2024-02-28
Borrower
APLD GPU-01, LLC (borrower)
Seniority
Secured, subsidiary-level; guaranteed; guaranteed by the Company, APLD Hosting, and Sai Computing, LLC (FY26 10-K)
Maturity
2029-03
Collateral
Security interest in AI-cloud customer service agreements (Jamestown GPU contracts)
Offtaker
AI-cloud customer service agreements (Jamestown; counterparties unnamed)
Lenders
Cornerstone Bank
Terms
$9.910M at 5/31/26 (was $12.866M at 5/31/25) Close read 2026-10-02: mainly real-estate secured: mortgage on the Jamestown property, all personal property, the Electrical Services Agreement and GPU customer contracts (assigned on default); sized at the lesser of $16M and 50% of appraised value; Bank of North Dakota participates. Flag for John: review whether it belongs in GPU collateral.

Source: FY26 10-K debt note + subsequent events (acc 0001144879-26-000048) · document

Starion Ellendale Loan (ELN-01)

Credit facility $8.1m 7.48% Entered 2023-02-16
Borrower
APLD ELN-01 LLC (borrower)
Seniority
Secured, subsidiary-level; parent-guaranteed
Maturity
2028-02
Collateral
First 100 MW Ellendale HPC assets + hosting-agreement assignment
Lenders
Starion Bank
Terms
$8.108M at 5/31/26 (was $12.283M at 5/31/25)

Source: FY26 10-K debt note + subsequent events (acc 0001144879-26-000048) · document

Starion Term Loan (Hosting)

Credit facility $3.9m 6.5% Entered 2022-07-25
Borrower
APLD Hosting, LLC (borrower)
Seniority
Secured, subsidiary-level; DSCR covenant
Maturity
2027-07-25
Collateral
Jamestown hosting facility + agreements
Lenders
Starion Bank
Terms
Originally $15M; $3.900M at 5/31/26 (was $7.061M at 5/31/25)

Source: FY26 10-K debt note + subsequent events (acc 0001144879-26-000048) · document

Collateral classes on this page: out, secured_undisclosed, operator_campus. The full ledger, with every issuer and the derived credit series, is on Compute Credit.